Readiness verdict
Sample assessment
LA-SAMPLE-24083
Launch 24-083 — Halvorsen HMS-2210 bilge monitor controller
Every requirement is satisfied by evidence at the revision that governs.
- 0
- Conflicts
- 0
- Gaps
- 0
- Dependencies
- 6
- Satisfied
- As of
- 24 September 2026 at 23:24 UTC
- Documents read
- 9
- Requirements
- 6
- Evidence items
- 92
- Examinations
- 1
Findings
0 open
Nothing stands open against this launch. Every requirement below is answered by a document Kythedra read, at the revision that governs.
Satisfied
6 covered by evidence
- 01SatisfiedRequirement 3.1
Salt mist test on Rev B assemblies passed 96 hours at severity level 2 with no loss of function and no corrosion.
“Assembly HMS-2210 at drawing Rev B meets requirement 3.1 of HMS-CPR-24-083 Rev B. The assembly withstood 96 hours of salt mist exposure per IEC 60068-2-52 severity level 2 with no loss of function and no corrosion of exposed conductors.”
ENVIRONMENTAL TEST REPORT
- 02SatisfiedRequirement 3.2
Three Rev B production boards measured 43–44 µm, exceeding the 40 µm minimum; material is IPC-CC-830B Type UR.
“The conformal coating process for assembly HMS-2210 at Rev B meets requirement 3.2.”
PROCESS VERIFICATION REPORT — CONFORMAL COATING
“Electrolube UR5604 is a Type UR polyurethane resin qualified to IPC-CC-830B.”
PROCESS VERIFICATION REPORT — CONFORMAL COATING
- 03SatisfiedRequirement 3.3
Plant 2 holds IPC-A-610H Class 3 CIS certification valid to 2028; all four operators assigned to HMS-2210 are currently certified.
“Standard: IPC-A-610H, Acceptability of Electronic Assemblies Certification class: Class 3, High Performance Electronic Products Certification type: Certified IPC Specialist (CIS) Date of issue: 2026-02-10 Valid until: 2028-02-10”
IPC CERTIFICATION RECORD
“The operators assigned to this assembly are MCA-0114, MCA-0147, MCA-0152 and MCA-0168. All four hold current IPC-A-610H Class 3 Certified IPC Specialist status as recorded above.”
IPC CERTIFICATION RECORD
- 04SatisfiedRequirement 3.4
Tideline TL-77-D is installed at J4 with no substitution; three lots are traceable to the manufacturer with certificates of conformance.
“Requirement 3.4 of HMS-CPR-24-083 Rev B is satisfied. The approved part Tideline TL-77-D is installed at J4, no substitution has occurred, and lot traceability to Tideline Components is maintained and evidenced for every board serial number in the production range.”
INCOMING INSPECTION AND LOT TRACEABILITY RECORD
“All three lots passed incoming inspection: dimensional check against the Tideline datasheet, actuation threshold check on a five piece sample per lot, and contact resistance check. No lot was rejected and no deviation was raised.”
INCOMING INSPECTION AND LOT TRACEABILITY RECORD
- 05SatisfiedRequirement 3.5
All 60 boards passed IP67 immersion at one metre for thirty minutes with results recorded per serial number.
“Requirement 3.5 of HMS-CPR-24-083 Rev B is satisfied. Every board passes IP67 immersion at one metre for thirty minutes with no water ingress and results are recorded per serial number.”
IP67 Immersion Test Results
“Every board is tested and its result recorded against its serial number as required by 3.5. No sampling is applied.”
IP67 Immersion Test Results
- 06SatisfiedRequirement 3.6
FAI report MCA-FAI-2026-0233 against Rev B was approved by Halvorsen without exception on 2026-09-22, before production release.
“First article inspection report MCA-FAI-2026-0233 against HMS-2210-DWG Rev B is approved without exception. Production release is granted.”
FIRST ARTICLE INSPECTION REPORT
“Halvorsen approval reference: HMS-FAI-APP-24-083 Approved by: L. Brenner, Supplier Quality, Halvorsen Marine Systems Date of approval: 2026-09-22”
FIRST ARTICLE INSPECTION REPORT
“All 7 dimensional characteristics inspected are within the tolerances stated on drawing Rev B. No dimensional deviation was found.”
FIRST ARTICLE INSPECTION REPORT
“All 5 electrical characteristics inspected are within specification. No electrical deviation was found.”
FIRST ARTICLE INSPECTION REPORT
Change history
1 examination
24 September 2026 at 23:24 UTC
READY
Documents added
- 9 documents added — bill-of-materials.csv, conformal-coating-report.txt, customer-requirements.txt, first-article-inspection-report.txt, float-switch-traceability.txt, ip67-immersion-results.csv, ipc-a-610-certification.txt, production-schedule.csv, salt-mist-test-report.txt
- Verdict set to READY
Send this to your customer
The same verdict, in a page they can read.
You choose when to send it. The report carries this launch and nothing else, and every finding in it still cites the document it came from.
Readiness Report
Send this verdict to your customer.
A read-only page carrying this launch only: the verdict, every finding with its basis, the change history and the documents examined. No access to this workspace, no other launch.
/r/XE3PICWB-8LeSS1zzpwrRP8rHQ-ucqOl
Keep this launch current
This verdict is as of 24 September 2026 at 23:24 UTC.
Evidence moves. Add the document that answers a finding and the launch reassesses itself — there is no re-run button, because new evidence is the trigger.
Add evidence
Drop in the test report, the revised drawing, the supplier’s confirmation. Kythedra reads it and reassesses this launch.
Sources
9 documents
- 01
IPC CERTIFICATION RECORD
Certification · 2026-02-10
11 evidence
- 02
CUSTOMER PRODUCT REQUIREMENTS DOCUMENT
Customer requirement · Rev B · 2026-06-30
3 evidence
- 03
Bill of Materials
Bill of materials · Rev B · 2026-07-14
23 evidence
- 04
ENVIRONMENTAL TEST REPORT
Test report · 2026-07-29
6 evidence
- 05
PROCESS VERIFICATION REPORT — CONFORMAL COATING
Test report · 2026-08-07
7 evidence
- 06
INCOMING INSPECTION AND LOT TRACEABILITY RECORD
Other document · 2026-08-21
7 evidence
- 07
IP67 Immersion Test Results
Test report · 2026-09-12
4 evidence
- 08
FIRST ARTICLE INSPECTION REPORT
Other document · 2026-09-18
19 evidence
- 09
Production Launch Schedule
Schedule · Rev 6 · 2026-09-23
12 evidence